kW managed the installation of this high profile lighting project at San Francisco City Hall. We teamed with Arup (lighting design engineer) to deliver lighting product market research; design and selection of LED products; design of the communication network for LED system; construction administration; and lighting control system commissioning. Our team met an aggressive timeline so that the system was operational during the Centennial Celebration that was held on June 19, 2015. The new LED system yields a 70% reduction in total exterior lighting costs.

Exterior Lighting Cost Savings

Over 70%

Peak Demand Reduction

17.5 kW

Date
Category
Commissioning, Project Implementation